Skip to main content
A collage showing people wheeling, walking, cycling and scooting in the city.

Safer, Better Streets - Surrenden Road / Surrenden Holt and Varndean College entrance

We’re looking to improve the pedestrian crossing facilities on Surrenden Road (north of Surrenden Holt) and outside the Varndean College vehicle entrance to make the crossings safer for all users.

Every year we assess requests for safety improvements all over the city, using our 'Safer, Better Streets’ assessment process.

The proposed improvements on Surrenden Road / Surrenden Holt include:

  • realigning and improving the existing informal pedestrian crossing
  • widening the pavements to shorten the crossing distances
  • upgrading the bus stop with accessible kerbs
  • installing dropped kerbs and tactile (bumpy pavement)

The proposed improvements on Surrenden Road / Varndean College entrance include:

  • realigning and improving the existing informal pedestrian crossing
  • widening the pavements to shorten the crossing distances
  • upgrading the bus stop with accessible kerbs
  • installing dropped kerbs and tactile (bumpy pavement)
  • removing the turning space to create a more pedestrian friendly area
  • installing a new cycle stands and cycle share hub

We want to hear your views

The survey is open until Sunday 22 February and should take 10 to 15 minutes to complete.

You can find more information on our Safer, Better Streets webpage, including how you can request a road safety improvement.

You can request a paper copy by emailing transport.projects@brighton-hove.gov.uk or calling 01273 29 48 08.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
115 participants

Phases

Phases overview
Phase 2: Tell us what you think
Tell us what you think
Phase 3: Analysis of results and finalising design
Analysis of results and finalising design
Phase 4: Consultation results
Consultation results
Phase 5: TRO (final chance to comment)
TRO (final chance to comment)
Phase 6: Implementation phase
Implementation phase

Analysis of results and finalising design

23 February 2026 - 20 April 2026

In this phase, we'll analyse the results of the survey and consider all of your comments before finalising the design for the Surrenden Road.